Order a call

Leave your phone and we will contact you

By pressing *Waiting for the call*, you consent to the processing, storage and use of your personal data.

Status of the works:

Work is underway on the +22,480 mark: reinforcement of the floor slab in the 5a-6a / T-P axes, preparatory work on self-counting in the 2a-8a / SL axes, dismantling of balconies in the 5-4 / AB axes. At the mark + 4,480… + 22,480, window openings are cut in the V-D / 1-2 axes. Installation of translucent enclosing structures in axes 2a-4a / CP at the mark +4.480 .. + 15.280. Installation of protective protections on perimeter of the building is carried out.

15
Building
0
Facade
0
Landscaping
0
Networks
Webcam

4 QUARTER 2022 YEAR

02.10.

2020

October

2 /14

Message sent

Wait for the answer from our managers

An error occurred

Message not sent due to unknown server error

EN UA RU
choose by parameters
Menu 3D
Choose by floor
№ of premise
Floor
Area m2 88.06
back
Favorites
0
Layouts
Found25from456
Favorites
Found25from456
Choose by parameters
0
Floor
Area m2
Hide
Floor:
от0to50
Area m2
от0to1000
Type
Floor
Area m2
To favorites
Found25from456
Ap.
The planning is on another house. To view it on a 3D model, you need to switch to another house.
%
%