Status of the works:

Installation of columns on a mark +18,880 is carried out. At the mark of +11,680 in the G-E / 1 axes, window openings are dismantled. In the axes V-G / 11-13 at the mark +11.680 ... + 22.480 the arrangement of doorways is performed. There is a rise of fittings on the floor. Preparation for the installation of parking fences. Installation of horizontal formwork PP in axes 1a-2a / U-P at the mark +22.480. Preparations are underway for the installation of a parking fence. Installation of horizontal formwork PP in the axes 1a-2a / U-P at +22.480.

15
Building
0
Facade
0
Landscaping
0
Networks
Webcam

4 QUARTER 2022 YEAR

02.10.

2020

October

2 /14

Message sent

Wait for the answer from our managers

An error occurred

Message not sent due to unknown server error

EN UA RU
choose by parameters
Menu 3D
Choose by floor
№ of premise
Floor
Area m2 88.06
back
Favorites
0
Layouts
Found25from456
Favorites
Found25from456
Choose by parameters
0
Floor
Area m2
Hide
Floor:
от0to50
Area m2
от0to1000
Type
Floor
Area m2
To favorites
Found25from456
Ap.
The planning is on another house. To view it on a 3D model, you need to switch to another house.
%
%