Status of the works:
The construction site is working on concreting the floor slab in axes 5-9 / V-D at +22.480, installation of translucent enclosing structures in axes 2a-4a / SR at +4.480 .. + 18.880, installation of construction cradles in axes 4a-8a / C-R at the mark +22.480 and dismantling of columns in axes 3-4 / B-B at the mark + 18.880… + 29.570. Columns are mounted on the +4.480 mark. The eruption of window openings at +18,880 continues. The site for unloading materials is also being prepared.
IV quarter of 2025