Status of the works:

The construction site is working on concreting the floor slab in axes 5-9 / V-D at +22.480, installation of translucent enclosing structures in axes 2a-4a / SR at +4.480 .. + 18.880, installation of construction cradles in axes 4a-8a / C-R at the mark +22.480 and dismantling of columns in axes 3-4 / B-B at the mark + 18.880… + 29.570. Columns are mounted on the +4.480 mark. The eruption of window openings at +18,880 continues. The site for unloading materials is also being prepared.

15
Building
0
Facade
0
Landscaping
0
Networks
Webcam

In process.

02.10.

2020

October

2 /14

Message sent

Wait for the answer from our managers

An error occurred

Message not sent due to unknown server error

EN UA RU

12.09.

2022

foto
6
photo
09

11.08.

2022

foto
4
photo
08

18.02.

2022

foto
7
photo
02

02.02.

2022

foto
22
photo
02

21.01.

2022

foto
6
photo
01

30.12.

2021

foto
19
photo
12

20.12.

2021

foto
5
photo
12

03.12.

2021

foto
11
photo
12

17.11.

2021

foto
4
photo
11

04.11.

2021

foto
2
photo
11

22.10.

2021

foto
14
photo
10

08.10.

2021

foto
3
photo
10

01.10.

2021

foto
3
photo
10

27.09.

2021

foto
14
photo
09

15.09.

2021

foto
1
photo
09

02.09.

2021

foto
1
photo
09

27.08.

2021

foto
10
photo
08

19.08.

2021

foto
3
photo
08

13.08.

2021

foto
2
photo
08

04.08.

2021

foto
5
photo
08

28.07.

2021

foto
4
photo
07

20.07.

2021

foto
15
photo
07

16.07.

2021

foto
2
photo
07

12.07.

2021

foto
2
photo
07

02.07.

2021

foto
4
photo
07

29.06.

2021

foto
12
photo
06

18.06.

2021

foto
2
photo
06

03.06.

2021

foto
14
photo
06

15.05.

2021

foto
4
photo
05