Status of the works:

Work is underway on the +22,480 mark: reinforcement of the floor slab in the 5a-6a / T-P axes, preparatory work on self-counting in the 2a-8a / SL axes, dismantling of balconies in the 5-4 / AB axes. At the mark + 4,480… + 22,480, window openings are cut in the V-D / 1-2 axes. Installation of translucent enclosing structures in axes 2a-4a / CP at the mark +4.480 .. + 15.280. Installation of protective protections on perimeter of the building is carried out.

15
Building
0
Facade
0
Landscaping
0
Networks
Webcam

4 QUARTER 2022 YEAR

02.10.

2020

October

2 /14

Message sent

Wait for the answer from our managers

An error occurred

Message not sent due to unknown server error

EN UA RU
INNOVATION
  • Innovative architecture
  • Unique for Ukraine facade decoration
  • New concept of “city space” is a multifunctional building that serves not only its residents but also the city
HONESTY
  • Refusal of an architectural imitation
  • Use of the best natural materials obtained in Ukraine
  • Openness to the city and people
VIRTUOSITY
  • Jewelry approach in architectureі
  • Harmonious combination of well-thought-out scenarios for life, work and leisure
  • Close attention to the details